Oxford County · Projects

Projects across Oxford

Explore County and municipal projects, with the authority responsible for each.

Money & projects Explore sections
FiltersRefine results
Reset

Project results

460 projects · All nine authorities · Showing 1–24

Woodstock · Parks, recreation & culture

Southside Aquatic Centre universal changeroom

The City’s November 6 notice schedules the Southside Aquatic Centre front-entrance closure for November 9 and directs patrons to the north side entrance until work is complete. No reopening date is supplied. This entrance notice does not establish a pool-wide closure or current conditions before November 9.

Woodstock · Southside Aquatic Centre

Front-entrance closure scheduled November 9; north side entrance
2026 allocation
Not established
Next target
2026-11-09 · Scheduled front-entrance closure
Latest update
2026-11-06 · Newer entrance notice schedules November 9

Blandford-Blenheim · Roads & bridges

Princeton drainage Phase 5 – final road surface

The September 24 notice set a weather-dependent October 10 paving target. A November 7 source check did not establish later Phase 5 completion, inspection or current road access. June 17 adopted minutes record a $1,091,195.04 plus HST award to Armstrong Paving and Materials Group Ltd.; this is not final expenditure.

Blandford-Blenheim

Past paving target; current access and completion unverified
2026 allocation
Not established
Named supplier
Armstrong Paving Group
Next target
No next date listed
Latest update
2026-11-04 · Term review provides broader reconstruction context

Norwich · Roads & bridges

Beaconsfield and Substation road conversion package

October 13 adopted minutes record a formal tender waiver and a $183,741 award to Permanent Paving Ltd., plus the Township’s non-refundable portion of HST, for a section of Substation Road asphalt. Council authorized the contractor agreement and an Oxford Cattle Company agreement covering the incremental asphalt cost above double surface treatment. Signed agreements, payments and completion are not established. The earlier report’s 2027 surface-treatment forecast remains a dated plan.

Norwich

Asphalt award in adopted minutes; execution and completion unverified
Original budget
$1,797,160
Named suppliers
South Brant Excavating Inc.; Walker Construction Limited; Permanent Paving Ltd.
Next target
No next date listed
Latest update
2026-11-03 · October 13 minutes adopted

Norwich · Roads & bridges

Beaconsfield Rd. Grvl Conv.

October 13 adopted minutes record a formal tender waiver and a $183,741 award to Permanent Paving Ltd., plus the Township’s non-refundable portion of HST, for a section of Substation Road asphalt. Council authorized the contractor agreement and an Oxford Cattle Company agreement covering the incremental asphalt cost above double surface treatment. Signed agreements, payments and completion are not established. The earlier report’s 2027 surface-treatment forecast remains a dated plan.

Norwich

Related Substation asphalt award in adopted minutes; Beaconsfield completion unverified
Revised budget
$771,000
Named suppliers
South Brant Excavating Inc.; Walker Construction Limited; Permanent Paving Ltd.
Next target
No next date listed
Latest update
2026-11-03 · October 13 minutes adopted

South-West Oxford · Housing & community services

Mount Elgin municipal office, library and childcare hub

October 20 draft minutes record resolution 8 authorizing $1,304,091 plus applicable HST for Early Works from the Working Capital Reserve and arrangements with Sierra General Contracting, subject to approvals. A November 3 staff follow-up says Sierra was notified. Minutes adoption, an executed contract and payment are not established; this is not approval or completion of the whole facility.

South-West Oxford

Early Works authorized in draft minutes; full facility separate
Original budget
$12,000,000
Next target
2028-01-01 · Anticipated childcare occupancy in proposed MOU
Latest update
2026-11-03 · Staff report says Sierra was notified

Norwich · Buildings & facilities

Norwich Medical Centre proposal

Council approved the property proposal in principle on September 8, 2026 and requested a working group and a fully costed plan and design to return in Q1 2027 for a final decision. A final construction budget, completed property transaction or open new facility is not established by the cited records.

Norwich

Approved in principle; costed plan requested
2026 allocation
Not established
Next target
2027 · Q1 2027: costed plan and design requested
Latest update
2026-11-03 · October 13 minutes adopted

Norwich · Parks, recreation & culture

Otterville pool replacement

October 13 adopted minutes record reconsideration of the September 8 motion, defeat of the grant application and preliminary-design authority of up to $60,000, and receipt of CAO2026-29 for information. This does not establish cancellation of the whole pool-replacement project. The October 13 minutes were adopted November 3 under resolution 2. Adoption confirms the written record; it does not add a construction, payment or completion decision.

Norwich

Grant/design motion lost in adopted minutes; whole project separate
Historical September 8 consulting ceiling
$60,000
Next target
No next date listed
Latest update
2026-11-03 · October 13 minutes adopted

Norwich · Roads & bridges

Substation Road Grvl Conv.

October 13 adopted minutes record a formal tender waiver and a $183,741 award to Permanent Paving Ltd., plus the Township’s non-refundable portion of HST, for a section of Substation Road asphalt. Council authorized the contractor agreement and an Oxford Cattle Company agreement covering the incremental asphalt cost above double surface treatment. Signed agreements, payments and completion are not established. The earlier report’s 2027 surface-treatment forecast remains a dated plan.

Norwich

Asphalt award in adopted minutes; execution and completion unverified
Revised budget
$1,026,100
Named suppliers
South Brant Excavating Inc.; Walker Construction Limited; Permanent Paving Ltd.
Next target
No next date listed
Latest update
2026-11-03 · October 13 minutes adopted

Zorra · Roads & bridges

25th Line, Road 60 to bridge, 0.7 km

Road 92 and 25th Line reopened in the first week of September after paving, shouldering and line painting. John Meathrell Bridge rehabilitation finished July 24. Historical completion, not a new October 30 reopening. John Meathrell is shared with South-West Oxford.

Zorra

Complete per staff report; road reopened
2026 allocation
$172,616
Named suppliers
Brantco Construction; Claussen Farms Custom Farming Inc.
Next target
No next date listed
Latest update
2026-10-30 · Road 92 and 25th Line paving complete

Zorra · Roads & bridges

Bridge 140, 33rd Line over Trout Creek

Report 2026-112 says Bridge 140 work on 33rd Line between Road 96 and Road 98 started October 5 and was completed with the road reopened within two weeks. Prepared for the November 4 council meeting; no exact reopening day is stated.

Zorra

Complete per staff report; road reopened
Revised budget
$224,072.69
Named supplier
AJN Builders Inc.
Next target
No next date listed
Latest update
2026-10-30 · Bridge 140 work complete; 33rd Line reopened

Zorra · Roads & bridges

Bridge 640, 25th Line, Meathrell Creek

Road 92 and 25th Line reopened in the first week of September after paving, shouldering and line painting. John Meathrell Bridge rehabilitation finished July 24. Historical completion, not a new October 30 reopening. John Meathrell is shared with South-West Oxford.

Zorra · South-West Oxford

Complete per staff report; road reopened
2026 allocation
$1,322,880
Named supplier
Weathertech Restoration Services Inc.
Next target
No next date listed
Latest update
2026-10-30 · Road 92 and 25th Line paving complete

Tillsonburg · Roads & bridges

Hardy Avenue resurfacing planned for November

Dufferin Construction is scheduled to mill and resurface Hardy Avenue from the Community Centre access road to Sanders Street, tentatively during the week of November 9 through November 27. Portions will close to public traffic. The Community Centre access intersection remains open; vehicle access to the Lions Den and South Pool entrances will be unavailable during the closure. Weather-dependent schedule; not evidence work has started.

Tillsonburg

Scheduled; weather-dependent
2026 allocation
Not established
Next target
2026-11-09 · Tentative start week, weather permitting
Latest update
2026-10-30 · Hardy Avenue resurfacing planned for November

Ingersoll · Parks, recreation & culture

MURC - Capital Campaign Coach

A professional advisor who will guide the Town through the planning and execution of the MURC A live browser visit returns Page Not Found. Search retrieval still exposes a cached December 2025 project page. That old timeline or on-budget badge is not current project progress.

Ingersoll

Current project progress unverified; official page unavailable
Revised budget
$290,000
Named supplier
Interkom Inc.
Next target
No next date listed
Latest update
2026-10-30 · MURC source link remains unavailable

Ingersoll · Roads & bridges

MURC - Clark Road Urbanization

The lands designated through the Town of Ingersoll Secondary Plan for the new Multi-Use Recreation Facility are currently unserviced. The Secondary Plan indicated that servicing would be enabled through the extension of water and sanitary sewers from Walker Road. Through preliminary investigation it was determined that sufficient grade is not available to enable this servicing scheme, and instead, servicing is to be extended from Harris Street. To service the lands with sanitary sewer from Harris Street via gravity feed, approximately 3 m± of fill is required in order to remove the existing sag in the road. This additional loading requires replacement of the existing culvert C 16 on Clark Road, initially slated for replacement in the 2026-2030 time horizon. Thus the total scope of work on Clark Road to service the MURC lands includes: Water and Sanitary Servicing, Storm Sewers, addition of 1 eastbound lane (total 3 lanes), sidewalks (or Multi-Use Trail), Streetlighting. A Class D (±20% accuracy) enabling works estimate was provided by Dillon Consulting amounting to $12,700,000. This estimate may reasonably be reduced to $8,500,000 though further design considerations relating to Hydraulic Conductivity of Halls Creek, and subsequent Geotechnical Investigation to confirm subgrade adequacy for structural footing design. Additional to this work will include the engineering design and contract administration estimated at 10% of construction value from the Class D estimate. A live browser visit returns Page Not Found. Search retrieval still exposes a cached December 2025 project page. That old timeline or on-budget badge is not current project progress.

Ingersoll

Current project progress unverified; official page unavailable
2026 allocation
$262,000
Next target
No next date listed
Latest update
2026-10-30 · MURC source link remains unavailable

Ingersoll · Parks, recreation & culture

MURC - Construction

The Town-hosted January 2026 status report says the design-build contract with Ball Construction was signed following Council approval. The exact signing day and executed agreement were not reviewed. This dated report does not establish current construction progress or opening.

Ingersoll

Design-build contract reported signed; current construction progress unverified
Lifetime project budget
$38,000,000
Next target
No next date listed
Latest update
2026-10-30 · October 30 webpage availability check

Ingersoll · Parks, recreation & culture

MURC - Internal Land Servicing

Through completion of the Clark Road Urbanization and service extensions, water and sanitary sewer will be available to the designated MURC lands. Internal grading and servicing design will allow in-progress institutional development for a long-term care facility, new elementary school, and the MURC to be completed and leave a balance of 20±acres for residential development. The scope of work for the internal grading and servicing will include topsoil stripping for the impacted lands, earth cut and fill, water, sanitary and storm sewer construction, and was all road building, streetlighting and sidewalks constructed to the MURC facility. Grading works will allow the MURC to commence construction while Clark Road is being reconstructed. Servicing and internal road-building can take place following Clark Road reconstruction and before the MURC grand opening. A Class D (±20% accuracy) estimate was provided by Dillon Consulting amounting to a constructed value of $8,323,405. Additional to this work will include the engineering design and contract administration estimated at 10% of construction value from the Class D estimate. A live browser visit returns Page Not Found. Search retrieval still exposes a cached December 2025 project page. That old timeline or on-budget badge is not current project progress.

Ingersoll

Current project progress unverified; official page unavailable
2026 allocation
$8,424,000
Next target
No next date listed
Latest update
2026-10-30 · MURC source link remains unavailable

Ingersoll · Parks, recreation & culture

MURC - Project Management

The MURC project involves ongoing oversight and coordination and administration required to complete the MURC. A live browser visit returns Page Not Found. Search retrieval still exposes a cached December 2025 project page. That old timeline or on-budget badge is not current project progress.

Ingersoll

Current project progress unverified; official page unavailable
2026 allocation
$250,000
Next target
No next date listed
Latest update
2026-10-30 · MURC source link remains unavailable

Zorra · Roads & bridges

Road 92, 23rd Line to Road 119, 1.5 km

Road 92 and 25th Line reopened in the first week of September after paving, shouldering and line painting. John Meathrell Bridge rehabilitation finished July 24. Historical completion, not a new October 30 reopening. John Meathrell is shared with South-West Oxford.

Zorra

Complete per staff report; road reopened
2026 allocation
$426,798
Named suppliers
Brantco Construction; Claussen Farms Custom Farming Inc.
Next target
No next date listed
Latest update
2026-10-30 · Road 92 and 25th Line paving complete

Zorra · Roads & bridges

Road 92, 25th to 23rd Line, 1.5 km

Road 92 and 25th Line reopened in the first week of September after paving, shouldering and line painting. John Meathrell Bridge rehabilitation finished July 24. Historical completion, not a new October 30 reopening. John Meathrell is shared with South-West Oxford.

Zorra

Complete per staff report; road reopened
2026 allocation
$426,798
Named suppliers
Brantco Construction; Claussen Farms Custom Farming Inc.
Next target
No next date listed
Latest update
2026-10-30 · Road 92 and 25th Line paving complete

County · Roads & bridges

County culvert replacements across local roads

Culvert replacements on parts of Oxford Roads 2, 10, 13, 22, 55 and 59, plus a left-turn lane at Oxford Road 2 and 35th Line.

Blandford-Blenheim · East Zorra-Tavistock · South-West Oxford · Zorra

Named OR2/OR22/OR59 sections complete; OR10 scheduled mid-October–end-November
2026 allocation
Not established
Named supplier
Steve Smith Construction Corporation
Next target
2026-10 · Oxford Road 10 start target
Latest update
2026-10-29 · Section-specific status reviewed

County · Other projects

Norwich lagoon biosolids cleanout

Clean biosolids from the County wastewater treatment lagoon.

Norwich

Enviroland named; $809,080 contract value published; completion unverified
2026 allocation
$1,400,000
Named supplier
Enviroland Services Inc.
Next target
No next date listed
Latest update
2026-10-29 · Published contract value verified

County · Roads & bridges

Oxford Road 9: follow the $14.2 million bid into delivery

The published update schedules a November winter pause, reopening with an all-way stop over winter and resumption in early 2027. The notice gives a planned reopening, not confirmation that the road reopened.

Ingersoll

November winter pause planned; work resumes early 2027
2026 allocation
Not established
Named supplier
J-AAR Civil Infrastructures Limited
Next target
2026-11 · Planned winter pause and reopening
Latest update
2026-10-22 · Winter-pause schedule published

East Zorra-Tavistock · Roads & bridges

Box Culvert 2015 replacement construction

Posted October 21 written minutes record a carried motion accepting Vandenberk Construction Inc.’s bid of $373,454.20 exclusive of taxes, with contingency if needed, and authorizing the CAO and Treasurer to sign. The staff report specifies $50,000 contingency; the motion does not repeat that amount. Formal minutes adoption, an executed agreement and completion have not been verified.

East Zorra-Tavistock

Bid acceptance recorded in written minutes; adoption unverified
2026 allocation
$600,000
Named supplier
Vandenberk Construction
Next target
No next date listed
Latest update
2026-10-21 · Written minutes record bid acceptance

County · Roads & bridges

Dundas Street reconstruction: phases and closures

The OR2/Dundas–OR12 intersection phase reopened October 21. Phase 2A of the wider reconstruction remains ongoing. The entire project is not complete.

Woodstock

Oxford Roads 2/12 intersection reopened; Phase 2A continues
2026 allocation
Not established
Named supplier
Network Sewer and Watermain Ltd
Next target
2026-11 · Overall completion target
Latest update
2026-10-21 · Phase 2B intersection complete and reopened
Explore projects by municipality
Tillsonburg42 recordsSouth-West Oxford27 recordsBlandford-Blenheim23 recordsIngersoll65 recordsEast Zorra-Tavistock41 recordsZorra46 recordsNorwich63 recordsWoodstock159 records
Project locations by municipality, not precise construction footprints. Shared records can affect more than one place. Boundaries: Ontario LIO · Open Government Licence – Ontario.

Related local issues

Make sense of the money

Make sense of the money

Your taxes called. They’d like a receipt.

Budget
Planned costs for a stated year or project.
Annual allocation
Funding assigned for one year. It may be part of a larger project.
Lifetime project budget
The stated budget for the full project across its years.
Forecast
An estimate of the eventual cost, as of the date shown.
Tax requirement (levy)
The amount to raise from property taxes, after other funding.
Contract award
The accepted contract price, with its stated tax and scope.
Recorded costs or payments
Amounts reported for the period shown. They do not establish project completion.

Why are there different County totals?

The detailed 2026 budget lists $279,035,275 in operating expenses and $127,855,640 in financed capital: $406,890,915 combined. The $103,039,171 property-tax requirement is a different measure, after other funding.