Spending decisions

2026-10-14 · Resolution 5 CP2026-164; Resolution 8 CP2026-301; Resolution 9 PW2026-35

October 14 council outcomes verified from published minutes

published post-meeting minutes

Consequence: Minutes record carried resolutions approving Sycamore OPA357 for a proposed 16-unit stacked-townhouse development in Tillsonburg; revised Lindprop draft subdivision approval with a two-year lapsing date; and the winter operations review for implementation. These are approvals and directions, not completed construction.

Open the source record
  1. October 14 council outcomes verified from published minutes
    Source date
    2026-10-14
    Event / reporting date
    2026-10-14
    Reviewed
    2026-10-30
    Retrieved
    2026-10-30
    Evidence status
    verified_primary
    Decision / approval status
    published post-meeting minutes
    Passage / page
    Resolution 5 CP2026-164; Resolution 8 CP2026-301; Resolution 9 PW2026-35
    Evidence note
    Primary-source body reviewed in the October 30 audit The adoption footer has a blank resolution number; formal adoption was not independently verified.

2026-10-14 · Resolution 10 CAO2026-18

Five advisory bodies re-established; Striking Committee deferred

carried as amended

Consequence: Council re-established Accessibility Advisory, Land Division, Library Board, Agricultural and Planning Advisory, and Active Transportation Advisory bodies. Recommendation 2f concerning the Striking Committee was removed pending a future report.

Open the source record
  1. Five advisory bodies re-established; Striking Committee deferred
    Source date
    2026-10-14
    Event / reporting date
    2026-10-14
    Reviewed
    2026-10-30
    Retrieved
    2026-10-30
    Evidence status
    verified_primary
    Decision / approval status
    carried as amended
    Passage / page
    Resolution 10 CAO2026-18
    Evidence note
    Primary-source body reviewed in the October 30 audit Application intake was not verified as open.

2026-08-12 · Municipal council / official public record

Temporary Woodingford transition-programme funding described

funding plan in Q2 report

Consequence: Attachment 5 sets out one-time CALTC funding of $1,067,660 for 2026/27 and 6.6 temporary FTE, ending March 31, 2027, with unspent funds returnable. Net budget impact is shown as $0.

Open the source record
  1. Temporary Woodingford transition-programme funding described
    Source date
    2026-08-12
    Date context
    Report dated; publication date not established
    Event / reporting date
    2026-08-12
    Reviewed
    2026-10-30
    Retrieved
    2026-10-30
    Evidence status
    verified_primary
    Decision / approval status
    funding plan in Q2 report
    Evidence note
    Primary-source body reviewed in the October 30 audit Associated council vote not reviewed; not proof positions are filled or programme expansion delivered. Report dated; publication date not established
More spending decisions (19)

2026-08-12 · FS2026-17 Attachment 2

Indwell Community Homes: 515 Main Street, Woodstock, 50-unit supportive housing

Contract Award – within budget

$1,950,000 · Reported in-year budget approval to award funds; not actual expenditure, bid amount, or vendor-invoice total

Consequence: Indwell Community Homes: 515 Main Street, Woodstock, 50-unit supportive housing — Capital

Open the source record
  1. FS2026-17 Attachment 2: Summary of In-Year Budget Approvals
    Source date
    2026-08-12
    Date context
    Report dated August 12, 2026; publication and individual approval dates not established
    Event / reporting date
    2026-08-12
    Reviewed
    2026-10-30
    Retrieved
    2026-10-30
    Evidence status
    verified_primary
    Evidence note
    15 specified rows inspected. Amount is reported in-year approval, not actual spending, bidder price or vendor invoice. Individual approval dates and tax treatment are unspecified.

2026-08-12 · FS2026-17 Attachment 2

Indwell Community Homes: same development operating support

Contract Award – within budget

$150,000 · Reported in-year budget approval to award funds; not actual expenditure, bid amount, or vendor-invoice total

Consequence: Indwell Community Homes: same development operating support — Operating

Open the source record
  1. FS2026-17 Attachment 2: Summary of In-Year Budget Approvals
    Source date
    2026-08-12
    Date context
    Report dated August 12, 2026; publication and individual approval dates not established
    Event / reporting date
    2026-08-12
    Reviewed
    2026-10-30
    Retrieved
    2026-10-30
    Evidence status
    verified_primary
    Evidence note
    15 specified rows inspected. Amount is reported in-year approval, not actual spending, bidder price or vendor invoice. Individual approval dates and tax treatment are unspecified.

2026-08-12 · FS2026-17 Attachment 2

Tillsonburg Non-Profit: 288 Tilson Avenue, 30-unit affordable housing

Contract Award – within budget

$1,500,000 · Reported in-year budget approval to award funds; not actual expenditure, bid amount, or vendor-invoice total

Consequence: Tillsonburg Non-Profit: 288 Tilson Avenue, 30-unit affordable housing

Open the source record
  1. FS2026-17 Attachment 2: Summary of In-Year Budget Approvals
    Source date
    2026-08-12
    Date context
    Report dated August 12, 2026; publication and individual approval dates not established
    Event / reporting date
    2026-08-12
    Reviewed
    2026-10-30
    Retrieved
    2026-10-30
    Evidence status
    verified_primary
    Evidence note
    15 specified rows inspected. Amount is reported in-year approval, not actual spending, bidder price or vendor invoice. Individual approval dates and tax treatment are unspecified.

2026-08-12 · FS2026-17 Attachment 2

OR19 Otterville Bridge 225536 superstructure replacement

Contract Award – within budget

$2,486,643 · Reported in-year budget approval to award funds; not actual expenditure, bid amount, or vendor-invoice total

Consequence: OR19 Otterville Bridge 225536 superstructure replacement

Open the source record
  1. FS2026-17 Attachment 2: Summary of In-Year Budget Approvals
    Source date
    2026-08-12
    Date context
    Report dated August 12, 2026; publication and individual approval dates not established
    Event / reporting date
    2026-08-12
    Reviewed
    2026-10-30
    Retrieved
    2026-10-30
    Evidence status
    verified_primary
    Evidence note
    15 specified rows inspected. Amount is reported in-year approval, not actual spending, bidder price or vendor invoice. Individual approval dates and tax treatment are unspecified.

2026-08-12 · FS2026-17 Attachment 2

Thornton Water Treatment Plant solar PV

Contract Award – within budget

$1,704,929 · Reported in-year budget approval to award funds; not actual expenditure, bid amount, or vendor-invoice total

Consequence: Thornton Water Treatment Plant solar PV

Open the source record
  1. FS2026-17 Attachment 2: Summary of In-Year Budget Approvals
    Source date
    2026-08-12
    Date context
    Report dated August 12, 2026; publication and individual approval dates not established
    Event / reporting date
    2026-08-12
    Reviewed
    2026-10-30
    Retrieved
    2026-10-30
    Evidence status
    verified_primary
    Evidence note
    15 specified rows inspected. Amount is reported in-year approval, not actual spending, bidder price or vendor invoice. Individual approval dates and tax treatment are unspecified.

2026-08-12 · FS2026-17 Attachment 2

2026 county-wide culvert replacement and OR2/35th Line left-turn lane

Contract Award – within budget

$2,554,908 · Reported in-year budget approval to award funds; not actual expenditure, bid amount, or vendor-invoice total

Consequence: 2026 county-wide culvert replacement and OR2/35th Line left-turn lane

Open the source record
  1. FS2026-17 Attachment 2: Summary of In-Year Budget Approvals
    Source date
    2026-08-12
    Date context
    Report dated August 12, 2026; publication and individual approval dates not established
    Event / reporting date
    2026-08-12
    Reviewed
    2026-10-30
    Retrieved
    2026-10-30
    Evidence status
    verified_primary
    Evidence note
    15 specified rows inspected. Amount is reported in-year approval, not actual spending, bidder price or vendor invoice. Individual approval dates and tax treatment are unspecified.

2026-08-12 · FS2026-17 Attachment 2

OR2 Dundas reconstruction CPKC overhead railway to OR12 Mill Street

Contract Award – within budget

$5,495,286 · Reported in-year budget approval to award funds; not actual expenditure, bid amount, or vendor-invoice total

Consequence: OR2 Dundas reconstruction CPKC overhead railway to OR12 Mill Street

Open the source record
  1. FS2026-17 Attachment 2: Summary of In-Year Budget Approvals
    Source date
    2026-08-12
    Date context
    Report dated August 12, 2026; publication and individual approval dates not established
    Event / reporting date
    2026-08-12
    Reviewed
    2026-10-30
    Retrieved
    2026-10-30
    Evidence status
    verified_primary
    Evidence note
    15 specified rows inspected. Amount is reported in-year approval, not actual spending, bidder price or vendor invoice. Individual approval dates and tax treatment are unspecified.

2026-08-12 · FS2026-17 Attachment 2

Green initiatives residential buildings: 16 George Norwich and 135 Carroll Ingersoll

Contract Award – within budget

$1,505,089 · Reported in-year budget approval to award funds; not actual expenditure, bid amount, or vendor-invoice total

Consequence: Green initiatives residential buildings: 16 George Norwich and 135 Carroll Ingersoll

Open the source record
  1. FS2026-17 Attachment 2: Summary of In-Year Budget Approvals
    Source date
    2026-08-12
    Date context
    Report dated August 12, 2026; publication and individual approval dates not established
    Event / reporting date
    2026-08-12
    Reviewed
    2026-10-30
    Retrieved
    2026-10-30
    Evidence status
    verified_primary
    Evidence note
    15 specified rows inspected. Amount is reported in-year approval, not actual spending, bidder price or vendor invoice. Individual approval dates and tax treatment are unspecified.

2026-08-12 · FS2026-17 Attachment 2

OR35 Devonshire reconstruction Victoria to Knightsbridge

Contract Award – within budget

$4,953,246 · Reported in-year budget approval to award funds; not actual expenditure, bid amount, or vendor-invoice total

Consequence: OR35 Devonshire reconstruction Victoria to Knightsbridge

Open the source record
  1. FS2026-17 Attachment 2: Summary of In-Year Budget Approvals
    Source date
    2026-08-12
    Date context
    Report dated August 12, 2026; publication and individual approval dates not established
    Event / reporting date
    2026-08-12
    Reviewed
    2026-10-30
    Retrieved
    2026-10-30
    Evidence status
    verified_primary
    Evidence note
    15 specified rows inspected. Amount is reported in-year approval, not actual spending, bidder price or vendor invoice. Individual approval dates and tax treatment are unspecified.

2026-08-12 · FS2026-17 Attachment 2

2026 CIP/HMA resurfacing parts of OR8 and OR59

Contract Award – within budget

$4,831,972 · Reported in-year budget approval to award funds; not actual expenditure, bid amount, or vendor-invoice total

Consequence: 2026 CIP/HMA resurfacing parts of OR8 and OR59

Open the source record
  1. FS2026-17 Attachment 2: Summary of In-Year Budget Approvals
    Source date
    2026-08-12
    Date context
    Report dated August 12, 2026; publication and individual approval dates not established
    Event / reporting date
    2026-08-12
    Reviewed
    2026-10-30
    Retrieved
    2026-10-30
    Evidence status
    verified_primary
    Evidence note
    15 specified rows inspected. Amount is reported in-year approval, not actual spending, bidder price or vendor invoice. Individual approval dates and tax treatment are unspecified.

2026-08-12 · FS2026-17 Attachment 2

OR29 Innerkip Bridge 805907 rehabilitation

Contract Award – within budget

$1,589,554 · Reported in-year budget approval to award funds; not actual expenditure, bid amount, or vendor-invoice total

Consequence: OR29 Innerkip Bridge 805907 rehabilitation

Open the source record
  1. FS2026-17 Attachment 2: Summary of In-Year Budget Approvals
    Source date
    2026-08-12
    Date context
    Report dated August 12, 2026; publication and individual approval dates not established
    Event / reporting date
    2026-08-12
    Reviewed
    2026-10-30
    Retrieved
    2026-10-30
    Evidence status
    verified_primary
    Evidence note
    15 specified rows inspected. Amount is reported in-year approval, not actual spending, bidder price or vendor invoice. Individual approval dates and tax treatment are unspecified.

2026-08-12 · FS2026-17 Attachment 2

OR59 Church Street urbanization Burgessville

Contract Award – within budget

$4,234,659 · Reported in-year budget approval to award funds; not actual expenditure, bid amount, or vendor-invoice total

Consequence: OR59 Church Street urbanization Burgessville

Open the source record
  1. FS2026-17 Attachment 2: Summary of In-Year Budget Approvals
    Source date
    2026-08-12
    Date context
    Report dated August 12, 2026; publication and individual approval dates not established
    Event / reporting date
    2026-08-12
    Reviewed
    2026-10-30
    Retrieved
    2026-10-30
    Evidence status
    verified_primary
    Evidence note
    15 specified rows inspected. Amount is reported in-year approval, not actual spending, bidder price or vendor invoice. Individual approval dates and tax treatment are unspecified.

2026-08-12 · FS2026-17 Attachment 2

OR59 Norwich Bridge 773216 superstructure replacement

Contract Award – within budget

$1,744,977 · Reported in-year budget approval to award funds; not actual expenditure, bid amount, or vendor-invoice total

Consequence: OR59 Norwich Bridge 773216 superstructure replacement

Open the source record
  1. FS2026-17 Attachment 2: Summary of In-Year Budget Approvals
    Source date
    2026-08-12
    Date context
    Report dated August 12, 2026; publication and individual approval dates not established
    Event / reporting date
    2026-08-12
    Reviewed
    2026-10-30
    Retrieved
    2026-10-30
    Evidence status
    verified_primary
    Evidence note
    15 specified rows inspected. Amount is reported in-year approval, not actual spending, bidder price or vendor invoice. Individual approval dates and tax treatment are unspecified.

2026-08-12 · FS2026-17 Attachment 2

Tillsonburg inlet trunk sanitary sewer replacement

Contract Award – <10% over budget

$1,537,648 · Reported in-year budget approval to award funds; not actual expenditure, bid amount, or vendor-invoice total

Consequence: Tillsonburg inlet trunk sanitary sewer replacement

Open the source record
  1. FS2026-17 Attachment 2: Summary of In-Year Budget Approvals
    Source date
    2026-08-12
    Date context
    Report dated August 12, 2026; publication and individual approval dates not established
    Event / reporting date
    2026-08-12
    Reviewed
    2026-10-30
    Retrieved
    2026-10-30
    Evidence status
    verified_primary
    Evidence note
    15 specified rows inspected. Amount is reported in-year approval, not actual spending, bidder price or vendor invoice. Individual approval dates and tax treatment are unspecified.

2026-08-12 · FS2026-17 Attachment 2

Unit 742 Tractor Dozer; delivery scheduled 2027

Contract Award – within budget

$1,394,730 · Reported in-year budget approval to award funds; not actual expenditure, bid amount, or vendor-invoice total

Consequence: Unit 742 Tractor Dozer; delivery scheduled 2027

Open the source record
  1. FS2026-17 Attachment 2: Summary of In-Year Budget Approvals
    Source date
    2026-08-12
    Date context
    Report dated August 12, 2026; publication and individual approval dates not established
    Event / reporting date
    2026-08-12
    Reviewed
    2026-10-30
    Retrieved
    2026-10-30
    Evidence status
    verified_primary
    Evidence note
    15 specified rows inspected. Amount is reported in-year approval, not actual spending, bidder price or vendor invoice. Individual approval dates and tax treatment are unspecified.

2026-06-30 · Municipal council / official public record

Q2 operating forecast: $1.338 million deficit

forecast; report dated August 12

Consequence: FS2026-17 forecasts an overall year-end operating deficit of $1,338,050 from June 30 information: general levy deficit $1,121,930; library surplus $10,155; water/wastewater surplus $284,380; programme-reserve deficit $510,655.

Open the source record
  1. Q2 operating forecast: $1.338 million deficit
    Source date
    2026-06-30
    Date context
    Financial period ending
    Event / reporting date
    2026-06-30
    Reviewed
    2026-10-30
    Retrieved
    2026-10-30
    Evidence status
    verified_primary
    Decision / approval status
    forecast; report dated August 12
    Evidence note
    Primary-source body reviewed in the October 30 audit Not final actuals or available cash. The report plans a November update for September 30. Financial period ending

2026-04-22 · Oxford County Council

808 Dundas property purchase approved

Official County timeline confirms Council approved the purchase; the acquisition closed May 29.

$4,550,000 · Property acquisition price; excludes renovation and operation

Consequence: County ownership enables the proposed support centre; capital renovation and service operation require their own delivery evidence.

Open the source record
  1. New Homelessness Support Centre — purchase, costs and timeline
    Publisher
    Oxford County
    Published
    2026-06-01
    Event / reporting date
    2026-05-29
    Reporting period
    2025 authorization; 2026 acquisition; proposed delivery through 2028
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    Official confirmation of purchase approval and completed acquisition; later delivery dates estimated
    Passage / page
    Timeline; Background — Process and Costs
    Evidence notes
    Acquisition, estimated capital costs and annual operating costs have distinct scopes. The centre and HART Hub are separate projects.

2025-12-10 · Oxford County Council

2026 Business Plan and Budget approval

County approval confirmed by the official budget hub; the detailed approved document is the financial source.

$406,890,915 · Detailed document total of operating plus financed capital; the budget hub headline conflicts.

Consequence: General levy: $96,680,548; library levy: $6,297,357; court security levy: $61,266. Water and wastewater are supported by utility rates.

2 source records
  1. Business plans and budgets
    Publisher
    Oxford County
    Reporting period
    2026
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    official approval summary
    Passage / page
    2026 approved budget section
    Evidence notes
    The hub reports $406.1 million total and $278.2 million operating, while the approved detailed PDF reports $406,890,915 and $279,035,275.
  2. Approved 2026 Business Plan and Budget
    Publisher
    Oxford County
    Published
    2026-01-14
    Event / reporting date
    2025-12-10
    Reporting period
    2026
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    approved
    Passage / page
    PDF page 58; printed page 58
    Evidence notes
    File date is January 14, 2026; County hub identifies December 10, 2025 Council approval. Detailed source governs figures; hub headline differs.

2025-12-10 · Oxford County Council

808 Dundas conditional offer authorized

County confirms Council authorized staff to submit an offer, conditional on funding and administrative requirements.

$5,000,000 · Maximum conditional offer authorization; not final price or total project budget

Consequence: County ownership enables the proposed support centre; capital renovation and service operation require their own delivery evidence.

Open the source record
  1. New Homelessness Support Centre — purchase, costs and timeline
    Publisher
    Oxford County
    Published
    2026-06-01
    Event / reporting date
    2026-05-29
    Reporting period
    2025 authorization; 2026 acquisition; proposed delivery through 2028
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    Official confirmation of purchase approval and completed acquisition; later delivery dates estimated
    Passage / page
    Timeline; Background — Process and Costs
    Evidence notes
    Acquisition, estimated capital costs and annual operating costs have distinct scopes. The centre and HART Hub are separate projects.
1Proposed2Authorized3Funded4Underway5Delivered6Outcome measured

These are distinct stages, not an automatic progress bar. Not every project follows the same sequence.

Explore the project map
N ↑TillsonburgTillsonburgSouth-West OxfordSouth-West OxfordBlandford-BlenheimBlandford–BlenheimIngersollIngersollEast Zorra-TavistockE. Zorra–TavistockZorraZorraNorwich TownshipNorwichWoodstockWoodstock1Main Street West, Norwich — Representative point on Main Street West; identifies the downtown discussion area, not the extent of a parking study or an individual parking lot.2Woodstock City Hall — City Hall is a civic reference point for the citywide budget and infrastructure issue; the policy applies across Woodstock.3808 Dundas Street — Address location for the proposed support centre; a map point does not imply the planned service is operating.4Clarke Road / Harris Street campus area — Exact OSM road intersection used as an explicitly approximate campus-area marker. Official material places the MURC south of Clarke Road and describes improvements east of Harris Street. This is not the campus parcel centroid or a proposed building footprint.5Annandale Ball Diamonds — Point from the destination coordinates in the Town project page’s location link for 160 Concession Street East. This is the ball-diamond site, not Annandale House museum.6Princeton paving area — Village location marks the Princeton-wide paving issue. The official notice names Main Street and multiple side streets; this pin is not a work-limit polygon.7Tavistock growth study — Settlement-centre reference point only. Do not render a circle or polygon as a proposed expansion boundary.8Innerkip growth study — Settlement-centre reference point only. Do not render a circle or polygon as a proposed expansion boundary.9Brownsville · Station 1 — Approximate area marker from the official station-specific embedded map camera centre. Address: 292244 Culloden Line. Camera centres can be offset from the building; do not use this for navigation or response-time analysis.10Mount Elgin · Station 2 — OSM fire-station building centre corresponding to the official service-page station and published address 333269 Plank Line. This is a station marker, not a response area.11Beachville · Station 3 — OSM fire-station building centre corresponding to the official service-page station and published address 434696 West Hill Line. This is a station marker, not a response area.12Matheson Park, Embro — Matheson Park point from the official parks page’s Get Directions link. Dog park is planned on land behind the ball diamond; this marker identifies the host park, not the dog-park footprint or an open facility.13Brock Street / George Street extension area — Representative Brock Street point. Township locates the preferred court site off Brock Street near the George Street extension on donated Kingwood parkland. Exact parcel/building coordinates were not established; do not label this as the final court footprint or the former recreation-centre option.
  1. Main Street West, Norwich
  2. Woodstock City Hall
  3. 808 Dundas Street
  4. Clarke Road / Harris Street campus area
  5. Annandale Ball Diamonds
  6. Princeton paving area
  7. Tavistock growth study
  8. Innerkip growth study
  9. Brownsville · Station 1
  10. Mount Elgin · Station 2
  11. Beachville · Station 3
  12. Matheson Park, Embro
  13. Brock Street / George Street extension area
Municipal boundaries · Ontario LIO · Open Government Licence – Ontario. Simplified for display; village names are not ward boundaries. Reference points © OpenStreetMap contributors. Pins locate the discussion, not a project footprint.

County actions in the public record

  1. Approved

    December 2025 announcement: $406.1 million budget

    The December 11, 2025 announcement reported $278.2 million for operations and $127.9 million in capital projects. These are the historical announcement figures. The final approved January 14 budget book records $279,035,275 operating and $127,855,640 capital expenses, totalling $406,890,915. The $103,039,171 levy is a separate measure. The reason for the difference is not established here. Budget approval does not establish actual spending or delivery.

    What has the approved budget delivered so far?

    Final approved budget book, page 58
  2. Opened

    52 homes opened at Southwood Way

    The new Woodstock building includes 37 affordable units. The County provided land, $1.4 million and development-charge exemptions; federal and provincial funding supported 19 of the affordable units.

    Who can access the affordable units, and how is affordability preserved?

  3. Policy direction

    Who pays for growth?

    Ryan described a growth-cost report, provincial discussions and higher targets for development within built-up areas. The statement identifies direction, not a completed cost study.

    What does the cost study show?

  4. Property acquired

    808 Dundas purchased; opening still ahead

    The purchase closed May 29. The June announcement describes a 55-bed, 24/7 centre targeted for spring 2028; that opening remains a future target.

    What are the renovation milestones, operating plan and public safety measures?

  5. Funding announced

    What will ambulance funding change?

    Hardeman’s office announced the 2026 Oxford allocations. Follow them through to staffing, response times and hospital transfers.

    Are ambulances reaching Oxford patients faster?

Institutional approvals are County decisions. Individual votes are attributed only when a voting record establishes them.

Published commitments from verified participants

No commitments submitted through verified profiles yet.

What happened after they said it?

Promises, decisions and results — with the source for each step.

Lacey Hird

campaign proposal · Sep 9, 2026

Open park washrooms during the day

Lacey Hird
Stated proposal

Favours opening existing park washrooms during daytime and increasing visible oversight to discourage vandalism.

Can they do this alone?
Norwich Council can set facility service levels and budgets; Township staff operate and maintain facilities.
Action
Open washrooms until dark.
Timing / cost
Not specified in reviewed statement / Not specified in reviewed statement

A public statement is documented. No election victory, individual control, future funding or delivery is implied.

Which washrooms would open, on what hours, at what operating cost?

Measure to seek: Published opening hours by park, actual availability and operating cost.

Displayed captions reviewed; audio not independently checked. Her description of available facilities and existing closures is not an independently verified inventory.

Karl Toews

public commitment · Sep 10, 2026

Request recorded votes on consequential decisions

Karl Toews
Stated proposal

Favours recorded votes on consequential decisions so residents can see individual councillors’ choices in future.

Can they do this alone?
An individual councillor can request recorded votes through the applicable meeting procedure; the council clerk maintains official minutes.
Action
Request recorded votes where warranted.
Timing / cost
Not specified in reviewed statement / Not specified in reviewed statement

A public statement is documented. No election victory, individual control, future funding or delivery is implied.

Which decisions will you request recorded votes on, and where can residents follow your requests?

Measure to seek: Recorded-vote requests and resulting published voting records; do not invent a count without minutes.

Displayed captions reviewed; audio not independently checked. This summarizes his rationale; it does not independently verify the number of recorded votes he requested.

Jerry Acchione

campaign proposal ·

Seek funding and input for the North Woodstock recreation facility

Jerry Acchione
Stated proposal

Supports the proposed North Woodstock recreation facility.

Can they do this alone?
City Council controls municipal facility plans and local funding; external governments decide their grant contributions.
Action
Seek provincial and federal funding and resident input.
Timing / cost
Not specified in reviewed statement / Not specified in reviewed statement
  1. Branch library added to schematic design

    Design scope changed; this is not evidence of a funded construction contract.

What facility scope, local cost and operating subsidy will you ask residents to support?

Measure to seek: Approved scope, secured funding by source, operating projection and contract milestones.

The campaign does not establish construction funding or an opening date.

Jarrod Erb

public commitment ·

Explain why 808 Dundas ranked above alternatives

Jarrod Erb
Stated proposal

Opposes locating the homelessness centre at 808 Dundas Street.

Can they do this alone?
County Council leads the purchase and homelessness project; a future City-County member can seek and explain releasable decision evidence.
Action
Publish why this property ranked above alternatives and involve affected residents earlier.
Timing / cost
Not specified in reviewed statement / Not specified in reviewed statement

A public statement is documented. No election victory, individual control, future funding or delivery is implied.

Which site-comparison information would you publish, and when?

Measure to seek: Published criteria, alternatives and reasons, with any withheld material and basis clearly identified.

Acknowledges County purchasing responsibility and potential negotiation confidentiality.

Lindsay Wilson

campaign commitment · Aug 4, 2026

Implement the Downtown Enhancement Plan during the next term

Lindsay Wilson
Stated proposal

Wants the Downtown Enhancement Plan implemented during the next term.

Can they do this alone?
Ingersoll Council controls Town allocations; departments deliver Town work, with separate BIA/private-property responsibilities.
Action
Commit Council time and resources to implementation.
Timing / cost
Next council term; project-level dates not supplied. / Not specified in reviewed statement
  1. Downtown Enhancement Plan adopted

    Plan approval is established through the Town page; individual funding and completed work need separate evidence.

Which adopted-plan projects will be funded first and what should residents see during the next term?

Measure to seek: Project-by-project authorization, budget, delivery date and completed public assets.

A project-level funding schedule is not given.

Sherry Ashby

campaign proposal · Sep 3, 2026

Seek a second ice pad

Sherry Ashby
Stated proposal

Supports adding a second ice pad to the new recreation facility.

Can they do this alone?
Ingersoll Council decides facility scope and municipal capital/operating funding.
Action
Seek a second ice surface.
Timing / cost
Not specified in reviewed statement / Not specified in reviewed statement

A public statement is documented. No election victory, individual control, future funding or delivery is implied.

What would a second ice surface add to construction and annual operating costs, and where would funding come from?

Measure to seek: Council decision specifically on a second pad and an identified capital/operating funding plan.

No committed funding is established.

Kelly Spencer

campaign proposal ·

Propose a one-year community safety ranger pilot

Kelly Spencer
Stated proposal

Proposes a reserve-funded, one-year community safety ranger pilot; pursue grants and partnerships.

Can they do this alone?
Tillsonburg can consider a local municipal program and lawful bylaw activities; County and health services retain their separate roles.
Action
Timing / cost
One-year pilot; start date not supplied. / Reserve-funded proposal; total amount not supplied; grants and partnerships also proposed.

A public statement is documented. No election victory, individual control, future funding or delivery is implied.

What would the pilot cost, what could rangers actually do, and which results would justify renewing it?

Measure to seek: Pilot approval, scope, one-year budget, service measures and public evaluation.

Deb Gilvesy

public commitment · Jul 8, 2026

Pursue completion of the ERTH partnership

Deb Gilvesy
Regulatory process documented; completion not established

Wants to see the proposed ERTH partnership through.

Can they do this alone?
Tillsonburg acts as municipal shareholder; the Ontario Energy Board determines the regulated acquisition application.
Action
Timing / cost
Not specified in reviewed statement / Not specified in reviewed statement
  1. Municipal collaboration approval

    Local approval; regulatory completion was still required.

  2. Latest filing located in reviewed OEB docket

    Reply filing, not an identified final decision.

What conditions remain, and what enforceable protections will ratepayers receive?

Measure to seek: Final OEB decision, closing record and public explanation of enforceable commitments.

Campaign preference; regulatory approval is a separate matter.

Clayton Haight

campaign target · Sep 30, 2026

Seek a zero-percent municipal tax increase

Clayton Haight
Stated proposal

Supports a zero-percent tax increase and seeking efficiencies.

Can they do this alone?
Blandford-Blenheim Council adopts its municipal budget. A mayor cannot unilaterally control County or education tax components.
Action
Use existing resources and require trade-offs for additions.
Timing / cost
Not specified in reviewed statement / Not specified in reviewed statement

A public statement is documented. No election victory, individual control, future funding or delivery is implied.

Does zero percent refer to the Township levy, tax rate or household bill, and what changes would pay for it?

Measure to seek: Explicit target definition followed by adopted budgets and transparent service trade-offs.

No costed service-reduction schedule appears in this answer.

Sheri Karelsen

public commitment · Sep 24, 2026

Advocate recorded votes and public explanations

Sheri Karelsen
Stated proposal

Would advocate recording every council vote and explaining decisions to residents.

Can they do this alone?
An EZT councillor can seek procedural changes and request recorded votes; council and its clerk maintain the official record.
Action
Timing / cost
Not specified in reviewed statement / Not specified in reviewed statement

A public statement is documented. No election victory, individual control, future funding or delivery is implied.

Will you seek a recorded vote on every decision, and where will your explanations be published?

Measure to seek: Recorded-vote requests, formal procedure changes and attributable public explanations.

Craig Gillis

campaign commitment · Jun 8, 2026

Continue work toward internet access at every SWOX premise

Craig Gillis
Stated proposal

Identifies quality internet access at every South-West Oxford premise as unfinished work.

Can they do this alone?
South-West Oxford can participate in and support connectivity initiatives; providers control network buildout and service delivery under their agreements.
Action
Continue the township connectivity project.
Timing / cost
Not specified in reviewed statement / Not specified in reviewed statement

A public statement is documented. No election victory, individual control, future funding or delivery is implied.

Which premises remain unserved, what is each provider committed to deliver, and by when?

Measure to seek: Verified service availability by premise or clearly defined coverage area, supported by provider and Township records.

The interview is not evidence that universal service has been delivered.

Mrs. Lori McDonald

campaign target ·

Propose four years without property-tax increases

Mrs. Lori McDonald
Stated proposal

Proposes no property-tax increases for four years.

Can they do this alone?
Zorra Council adopts Township budgets; County and education components are separate. Wage decisions also depend on contracts and employment obligations.
Action
Also proposes a four-year freeze on council and municipal staff wage increases.
Timing / cost
Four years; target baseline and annual tax measure need clarification. / Also proposes no council or municipal staff wage increases for four years; costed savings and service consequences not supplied.

A public statement is documented. No election victory, individual control, future funding or delivery is implied.

Which tax measure would be frozen for four years, and how would the staffing, service and reserve budget balance?

Measure to seek: Four annual adopted budgets against a clearly defined tax baseline, with service and reserve consequences.

A campaign proposal; council decisions, employment obligations and service impacts remain relevant.

Marcus Ryan

institutional policy direction · Apr 20, 2026

Explain the cost of growth and increase intensification

Marcus Ryan
Stated proposal

Supports more growth inside existing built-up areas and a clearer account of who pays.

Can they do this alone?
County Council directs County growth policy; the Warden explains collective direction. Local councils and Ontario retain distinct planning and servicing powers.
Action
Outlined a growth-cost study, discussions with Ontario and higher intensification targets.
Timing / cost
Not specified in reviewed statement / Not specified in reviewed statement
  1. Official Plan survey closed

    Closure of this survey does not mean the full statutory planning process is finished.

Where is the cost-of-growth analysis, and which costs will existing households and new development each pay?

Measure to seek: Published cost analysis, adopted intensification policies and documented infrastructure cost allocation.

His statement describes Council’s policy direction. It is not an individual roll-call vote or proof that the targets have been achieved.

Arpan Khanna

introduced legislation · Sep 22, 2025

Introduce stricter federal bail legislation

Arpan Khanna
Bill defeated at second reading

Proposed stricter bail rules focused on public protection.

Can they do this alone?
An MP can sponsor a bill, debate and vote. Enactment depends on Parliament; court decisions are separate.
Action
Sponsored Bill C-242, the Jail Not Bail Act.
Timing / cost
Not specified in reviewed statement / Not specified in reviewed statement
  1. Bill introduced

    Khanna sponsored C-242. Introduction establishes action on the proposal, not enactment.

  2. Second reading defeated

    The proposal did not become law. House division: 136 Yea, 193 Nay; 10 paired recorded separately.

After C-242’s defeat, which specific change will you pursue next and how would its effect be measured?

Measure to seek: Legislative stages and, only if enacted, implementation and relevant outcome evidence.

The proposal expanded offences requiring the accused to justify release and called for annual federal bail reporting. It did not become law.

Ernie Hardeman

funding announcement · Sep 14, 2026

Announce Oxford ambulance and offload funding

Ernie Hardeman
Funding announced; local outcome not established

Says increased ambulance funding should improve access to timely emergency care.

Can they do this alone?
Ontario allocates provincial funding; Oxford County operates local paramedic services, with hospitals and provincial systems controlling other parts of emergency care.
Action
Announced $10,889,606 for Oxford: $10,780,406 land ambulance funding plus $109,200 for dedicated offload support.
Timing / cost
Not specified in reviewed statement / $10,889,606 announced total: $10,780,406 annual land-ambulance funding plus $109,200 offload support. The annual land-ambulance total includes the 14% increase; it is not all new funding.

A public statement is documented. No election victory, individual control, future funding or delivery is implied.

What changed in Oxford response times, staffing and hospital offload after the announced funding?

Measure to seek: Oxford-specific staffing, response and offload measures before and after implementation; do not substitute province-wide percentages.

The land-ambulance figure is the annual provincial total after a 14% increase, not $10.78 million entirely new funding. The reported 68% offload improvement is province-wide, not an Oxford result.

Who’s actually in charge?

Who’s actually in charge?

01

Local council

Municipal services, local roads, recreation, zoning and the local budget.

Explore this level →
02

Oxford County

County roads, water and wastewater, housing services, paramedics and County planning.

Explore this level →

Meet your representatives