02Follow the moneySouth-West Oxford

South-West Oxford · Evidence coverage

Hold this record to account, too.

See exactly which records were reviewed, what has been extracted and what still needs checking.

Money & projects Explore sections

Research method and coverage examples

Baseline financial extraction cutoff: 2026-10-01. Selected records were refreshed October 29; individual sources retain their actual review dates. Coverage is described by authority and record type. A failed retrieval is an access problem, not proof of non-disclosure.

Select a municipality above or expand its research below. Original sources and research limits are retained.

South-West Oxford

History window: January 1, 2026–2026-10-01. Active project origins may precede this window. Selected project-linked decisions are published; this is not a complete register of every resolution.

History sources and coverage boundary
Requested history begins
2026-01-01
Research cutoff
2026-10-01
completeness
No
reviewed Scope
Selected January-September 2026 project-linked minutes, original staff reports, tender awards, audited accounts and management year-end schedules. January20 truck purchase/hub shortlist; April7 asphalt award; July14 hub/Centreville/audit decisions; August11 awards, deferral and reserves; September15 childcare proposal and September24 Centreville request. Earlier still-active 2024-2025 contract origins retained.
reviewed Meeting Dates
  • 2026-01-20
  • 2026-04-07
  • 2026-07-14
  • 2026-08-11
  • 2026-09-15
  • 2026-09-24
record Status By Meeting
Adopted minutes: purchase and procurement-shortlist decisions. Adopted minutes and asphalt report. Adopted minutes and original hub/Centreville reports. Adopted minutes and original roof/gravel/year-end reports. Original childcare MOU proposal; adopted outcome not verified. Special meeting agenda and CAO48-2026 original report; adopted minutes not posted in reviewed index at cutoff, outcome unconfirmed.
earlier Baselines
  • 2025-12-16 final adopted 2026 budget
  • 2025-11-10 detailed working budget explicitly superseded
  • 2025-03-04 two-season grass-cutting award
  • Selected 2024-2025 drain/road awards with completion not established
  • 2025 audited accounts and management year-end actuals
Actuals reporting cutoff
2026-06-30
Coverage limit
Bounded project-linked history, not all Council decisions or the complete current-year expenditure/award/change register. Superseded draft accounts do not establish final adopted account allocations.
Scope notes
V7 adds June 30 net departmental figures and selected later delivery updates. Original approvals and reporting periods remain separate.
10 source records
  1. January 20, 2026 Council minutes
    Publisher
    Township of South West Oxford
    Published
    2026-01-20
    Event / reporting date
    2026-01-20
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    approved minutes
    Passage / page
    PDF pp. 2–5; resolutions 4 and 8
    Evidence notes
    Waste truck purchase and civic-hub prequalification.
  2. April 7, 2026 Council minutes
    Publisher
    Township of South West Oxford
    Published
    2026-04-07
    Event / reporting date
    2026-04-07
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    approved minutes
    Passage / page
    PDF p. 4, resolution 7: 2026 asphalt award
    Evidence notes
    Approves Permanent Paving bid plus applicable taxes.
  3. July 14, 2026 Council minutes
    Publisher
    Township of South West Oxford
    Published
    2026-07-14
    Event / reporting date
    2026-07-14
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    approved minutes
    Passage / page
    Resolutions 4, 15, 17, 19, 22–23
    Evidence notes
    Audit approval; Centreville increase; hub report received; airport request declined; financing by-law.
  4. August 11, 2026 Council minutes
    Publisher
    Township of South West Oxford
    Published
    2026-08-11
    Event / reporting date
    2026-08-11
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    approved minutes
    Passage / page
    Resolutions 13, 14, 17, 18 and 22
    Evidence notes
    Roof/gravel awards, Museum deferral, reserve transfers and accounts-payable approval.
  5. CAO45-2026: Oxford Community Child Care MOU
    Publisher
    Township of South West Oxford
    Published
    2026-09-15
    Event / reporting date
    2026-09-15
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    published
    Passage / page
    PDF pp. 1–10; MOU space, occupancy and conditions
    Evidence notes
    Staff recommendation and proposed MOU; not an executed lease or confirmed opening date.
  6. CAO48-2026: Centreville gabion project and additional funding
    Publisher
    Township of South West Oxford
    Published
    2026-09-24
    Event / reporting date
    2026-09-24
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    published
    Passage / page
    PDF pp. 1–4; contract, urgency, funding options
    Evidence notes
    September 15 had not approved additional $40k; September 24 minutes not posted in reviewed official index as of cutoff. Do not call recommendation approved.
  7. Official bids and tenders: published award archive
    Publisher
    Township of South West Oxford
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    published
    Passage / page
    Awarded tenders section: grass cutting, Piper Drain, asphalt, Strik Drain
    Evidence notes
    Primary archive opened; later closed tenders are not automatically awards.
  8. December 16, 2025 Council minutes: By-law 77-2025
    Publisher
    Township of South West Oxford
    Published
    2025-12-16
    Event / reporting date
    2025-12-16
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    adopted
    Passage / page
    Resolution 14; adoption of 2026 estimates
    Evidence notes
    Final adopted schedule controls over November 10 draft.
  9. 2025 audited consolidated financial statements
    Publisher
    Township of South West Oxford
    Published
    2026-07-14
    Event / reporting date
    2026-07-14
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    audited
    Passage / page
    PDF pp. 5–6 and 14–15: statements and notes 9–10
    Evidence notes
    Original scanned PDF downloaded; key pages OCR-extracted and statement of operations visually checked. Council approved July 14.
  10. TR12-2026: 2025 surplus/deficit and reserve allocation
    Publisher
    Township of South West Oxford
    Published
    2026-08-11
    Event / reporting date
    2026-08-11
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    published
    Passage / page
    PDF pp. 1–15: year-end service and asset actuals; reserve continuity
    Evidence notes
    Management net-budget basis. 2026 reserve column is projected after transfers, not audited 2026 closing cash.

10 budget schedules · 965 extracted allocation rows · 23 projects · 11 procurement records · 18 decisions

Extracted 2026 decision dates: 2026-01-20 · 2026-04-07 · 2026-07-14 · 2026-08-11 · 2026-09-01 · 2026-09-15 · 2026-10-06 · 2026-10-20. These dates are not a list of all meetings reviewed.

South-West Oxford · records researched through 2026-10-01
Record typeResearch stateCoverage & remaining question
Approved operating budgetPrimary record verified

Complete final combined expenditure and net levy schedules

Limit: January–September 2026 source review with earlier active-contract origins. Not a claim every decision, project or invoice is indexed. November draft account numbers remain explicitly superseded.

Next question: Publish the final adopted account export, latest committed spending and complete 2026 award/change register.

Search boundary
  • Final December16 adoption
  • November10 detailed budget agenda
  • 2025 audit and August year-end allocation
  • January–September council agenda/minute index
  • Official award archive
  • September24 special Centreville agenda
3 source records
  1. December 16, 2025 Council minutes: By-law 77-2025
    Publisher
    Township of South West Oxford
    Published
    2025-12-16
    Event / reporting date
    2025-12-16
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    adopted
    Passage / page
    Resolution 14; adoption of 2026 estimates
    Evidence notes
    Final adopted schedule controls over November 10 draft.
  2. By-law 77-2025 Schedule A: 2026 expenditures
    Publisher
    Township of South West Oxford
    Published
    2025-12-16
    Event / reporting date
    2025-12-16
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    adopted
    Passage / page
    PDF p. 1, all expenditure rows
    Evidence notes
    Combined operating, capital, debt and reserve-transfer budget; not PSAB annual expense.
  3. Final 2026 budget departmental executive summary
    Publisher
    Township of South West Oxford
    Published
    2025-12-16
    Event / reporting date
    2025-12-16
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    adopted
    Passage / page
    PDF p. 1; net departmental tax requirements
    Evidence notes
    Final levy $7,712,934, not the November draft $7,701,568.
Approved capital budgetPrimary record verified

Capital within adopted combined budget; major preliminary hub provision

Limit: Adopted capital is embedded in a combined budget. Only separately labelled lines and the staff-confirmed preliminary hub authorization are extracted as approved capital; no invented total-capital headline.

Next question: Publish the final adopted account export, latest committed spending and complete 2026 award/change register.

Search boundary
  • Final December16 adoption
  • November10 detailed budget agenda
  • 2025 audit and August year-end allocation
  • January–September council agenda/minute index
  • Official award archive
  • September24 special Centreville agenda
3 source records
  1. December 16, 2025 Council minutes: By-law 77-2025
    Publisher
    Township of South West Oxford
    Published
    2025-12-16
    Event / reporting date
    2025-12-16
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    adopted
    Passage / page
    Resolution 14; adoption of 2026 estimates
    Evidence notes
    Final adopted schedule controls over November 10 draft.
  2. By-law 77-2025 Schedule A: 2026 expenditures
    Publisher
    Township of South West Oxford
    Published
    2025-12-16
    Event / reporting date
    2025-12-16
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    adopted
    Passage / page
    PDF p. 1, all expenditure rows
    Evidence notes
    Combined operating, capital, debt and reserve-transfer budget; not PSAB annual expense.
  3. CAO35-2026: Municipal office, library and childcare project update
    Publisher
    Township of South West Oxford
    Published
    2026-07-14
    Event / reporting date
    2026-07-14
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    published
    Passage / page
    PDF pp. 1–7 and appendices
    Evidence notes
    Full 13.8 MB original downloaded and read. $12m preliminary budget, $13.2m planning estimate including contingency; report received for information.
Detailed service & account schedulesPrimary record verified

Final 38-row spending schedule; superseded full working account ledger; detailed 2025 actual service/asset ledger

Limit: January–September 2026 source review with earlier active-contract origins. Not a claim every decision, project or invoice is indexed. November draft account numbers remain explicitly superseded.

Next question: Publish the final adopted account export, latest committed spending and complete 2026 award/change register.

Search boundary
  • Final December16 adoption
  • November10 detailed budget agenda
  • 2025 audit and August year-end allocation
  • January–September council agenda/minute index
  • Official award archive
  • September24 special Centreville agenda
4 source records
  1. November 10 budget meeting: detailed accounts and facility schedules
    Publisher
    Township of South West Oxford
    Published
    2025-11-10
    Event / reporting date
    2025-11-10
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    superseded draft
    Passage / page
    147-page agenda: accounts pp. 11–15, 17–25, 66–77, 80–87, 92–121, 124–141; local hall/park budgets pp. 26–61
    Evidence notes
    Full original downloaded and extracted. This is a superseded working draft. Account detail is retained as draft provenance; no assumption every proposed account was adopted unchanged.
  2. By-law 77-2025 Schedule A: 2026 expenditures
    Publisher
    Township of South West Oxford
    Published
    2025-12-16
    Event / reporting date
    2025-12-16
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    adopted
    Passage / page
    PDF p. 1, all expenditure rows
    Evidence notes
    Combined operating, capital, debt and reserve-transfer budget; not PSAB annual expense.
  3. By-law 77-2025 Schedule A: 2026 sources of financing
    Publisher
    Township of South West Oxford
    Published
    2025-12-16
    Event / reporting date
    2025-12-16
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    adopted
    Passage / page
    PDF p. 1, all financing rows
    Evidence notes
    Source labels include very large general-government reserve transfer; do not relabel financing as new expense or assumed cash on hand.
  4. TR12-2026: 2025 surplus/deficit and reserve allocation
    Publisher
    Township of South West Oxford
    Published
    2026-08-11
    Event / reporting date
    2026-08-11
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    published
    Passage / page
    PDF pp. 1–15: year-end service and asset actuals; reserve continuity
    Evidence notes
    Management net-budget basis. 2026 reserve column is projected after transfers, not audited 2026 closing cash.
Amendments & carryforwardsPrimary record verified

July Centreville increase, September request, Museum deferral and reserve transfers

Limit: January–September 2026 source review with earlier active-contract origins. Not a claim every decision, project or invoice is indexed. November draft account numbers remain explicitly superseded.

Next question: Publish the final adopted account export, latest committed spending and complete 2026 award/change register.

Search boundary
  • Final December16 adoption
  • November10 detailed budget agenda
  • 2025 audit and August year-end allocation
  • January–September council agenda/minute index
  • Official award archive
  • September24 special Centreville agenda
4 source records
  1. July 14, 2026 Council minutes
    Publisher
    Township of South West Oxford
    Published
    2026-07-14
    Event / reporting date
    2026-07-14
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    approved minutes
    Passage / page
    Resolutions 4, 15, 17, 19, 22–23
    Evidence notes
    Audit approval; Centreville increase; hub report received; airport request declined; financing by-law.
  2. August 11, 2026 Council minutes
    Publisher
    Township of South West Oxford
    Published
    2026-08-11
    Event / reporting date
    2026-08-11
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    approved minutes
    Passage / page
    Resolutions 13, 14, 17, 18 and 22
    Evidence notes
    Roof/gravel awards, Museum deferral, reserve transfers and accounts-payable approval.
  3. CAO48-2026: Centreville gabion project and additional funding
    Publisher
    Township of South West Oxford
    Published
    2026-09-24
    Event / reporting date
    2026-09-24
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    published
    Passage / page
    PDF pp. 1–4; contract, urgency, funding options
    Evidence notes
    September 15 had not approved additional $40k; September 24 minutes not posted in reviewed official index as of cutoff. Do not call recommendation approved.
  4. TR12-2026: 2025 surplus/deficit and reserve allocation
    Publisher
    Township of South West Oxford
    Published
    2026-08-11
    Event / reporting date
    2026-08-11
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    published
    Passage / page
    PDF pp. 1–15: year-end service and asset actuals; reserve continuity
    Evidence notes
    Management net-budget basis. 2026 reserve column is projected after transfers, not audited 2026 closing cash.
Latest interim actualsPrimary record verified

2026 net departmental budget-to-actual schedule through June 30; eleven non-overlapping parent totals extracted.

Limit: Net cost/financing basis; not gross expenditure or full project payment register.

Next question: What has changed since June 30, and which invoices remain unposted?

Search boundary
  • Final December16 adoption
  • November10 detailed budget agenda
  • 2025 audit and August year-end allocation
  • January–September council agenda/minute index
  • Official award archive
  • September24 special Centreville agenda
Open the source record
  1. TR13-2026: 2026 First and Second Quarter Budget Update
    Publisher
    Township of South West Oxford
    Published
    2026-09-01
    Event / reporting date
    2026-09-01
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    published
    Passage / page
    pp. 1–2 narrative; pp. 4–7 budget/actual schedule
    Evidence notes
    Actual cutoff June 30; narrative can describe later work. Capital and operating entries ongoing. Public accounting net amounts, not gross payment totals.
Audited annual accountsPrimary record verified

2025 consolidated accounts approved July 14

Limit: January–September 2026 source review with earlier active-contract origins. Not a claim every decision, project or invoice is indexed. November draft account numbers remain explicitly superseded.

Next question: Publish the final adopted account export, latest committed spending and complete 2026 award/change register.

Search boundary
  • Final December16 adoption
  • November10 detailed budget agenda
  • 2025 audit and August year-end allocation
  • January–September council agenda/minute index
  • Official award archive
  • September24 special Centreville agenda
2 source records
  1. 2025 audited consolidated financial statements
    Publisher
    Township of South West Oxford
    Published
    2026-07-14
    Event / reporting date
    2026-07-14
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    audited
    Passage / page
    PDF pp. 5–6 and 14–15: statements and notes 9–10
    Evidence notes
    Original scanned PDF downloaded; key pages OCR-extracted and statement of operations visually checked. Council approved July 14.
  2. July 14, 2026 Council minutes
    Publisher
    Township of South West Oxford
    Published
    2026-07-14
    Event / reporting date
    2026-07-14
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    approved minutes
    Passage / page
    Resolutions 4, 15, 17, 19, 22–23
    Evidence notes
    Audit approval; Centreville increase; hub report received; airport request declined; financing by-law.
Funding, reserves & debtPrimary record verified

Final financing, management reserve continuity and audited debt/reserves

Limit: January–September 2026 source review with earlier active-contract origins. Not a claim every decision, project or invoice is indexed. November draft account numbers remain explicitly superseded.

Next question: Publish the final adopted account export, latest committed spending and complete 2026 award/change register.

Search boundary
  • Final December16 adoption
  • November10 detailed budget agenda
  • 2025 audit and August year-end allocation
  • January–September council agenda/minute index
  • Official award archive
  • September24 special Centreville agenda
4 source records
  1. By-law 77-2025 Schedule A: 2026 sources of financing
    Publisher
    Township of South West Oxford
    Published
    2025-12-16
    Event / reporting date
    2025-12-16
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    adopted
    Passage / page
    PDF p. 1, all financing rows
    Evidence notes
    Source labels include very large general-government reserve transfer; do not relabel financing as new expense or assumed cash on hand.
  2. TR12-2026: 2025 surplus/deficit and reserve allocation
    Publisher
    Township of South West Oxford
    Published
    2026-08-11
    Event / reporting date
    2026-08-11
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    published
    Passage / page
    PDF pp. 1–15: year-end service and asset actuals; reserve continuity
    Evidence notes
    Management net-budget basis. 2026 reserve column is projected after transfers, not audited 2026 closing cash.
  3. 2025 audited consolidated financial statements
    Publisher
    Township of South West Oxford
    Published
    2026-07-14
    Event / reporting date
    2026-07-14
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    audited
    Passage / page
    PDF pp. 5–6 and 14–15: statements and notes 9–10
    Evidence notes
    Original scanned PDF downloaded; key pages OCR-extracted and statement of operations visually checked. Council approved July 14.
  4. CAO35-2026: Municipal office, library and childcare project update
    Publisher
    Township of South West Oxford
    Published
    2026-07-14
    Event / reporting date
    2026-07-14
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    published
    Passage / page
    PDF pp. 1–7 and appendices
    Evidence notes
    Full 13.8 MB original downloaded and read. $12m preliminary budget, $13.2m planning estimate including contingency; report received for information.
Active projects & timelinesPrimary record verified

Hub, park, Centreville, roads, maintenance and local community works

Limit: January–September 2026 source review with earlier active-contract origins. Not a claim every decision, project or invoice is indexed. November draft account numbers remain explicitly superseded.

Next question: Publish the final adopted account export, latest committed spending and complete 2026 award/change register.

Search boundary
  • Final December16 adoption
  • November10 detailed budget agenda
  • 2025 audit and August year-end allocation
  • January–September council agenda/minute index
  • Official award archive
  • September24 special Centreville agenda
6 source records
  1. CAO35-2026: Municipal office, library and childcare project update
    Publisher
    Township of South West Oxford
    Published
    2026-07-14
    Event / reporting date
    2026-07-14
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    published
    Passage / page
    PDF pp. 1–7 and appendices
    Evidence notes
    Full 13.8 MB original downloaded and read. $12m preliminary budget, $13.2m planning estimate including contingency; report received for information.
  2. CAO45-2026: Oxford Community Child Care MOU
    Publisher
    Township of South West Oxford
    Published
    2026-09-15
    Event / reporting date
    2026-09-15
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    published
    Passage / page
    PDF pp. 1–10; MOU space, occupancy and conditions
    Evidence notes
    Staff recommendation and proposed MOU; not an executed lease or confirmed opening date.
  3. Mount Elgin Park preliminary landscape budget estimate
    Publisher
    Ron Koudys Landscape Architects / Township of South-West Oxford
    Published
    2026-04-14
    Event / reporting date
    2026-04-14
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    published
    Passage / page
    PDF p. 1; all 11 estimate lines
    Evidence notes
    Budget range only; excludes applicable taxes and multiple enabling works.
  4. CAO33-2026: Centreville Dam project update and funding request
    Publisher
    Township of South West Oxford
    Published
    2026-07-14
    Event / reporting date
    2026-07-14
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    published
    Passage / page
    PDF pp. 1–4
    Evidence notes
    EA and gabion work funding; not total decommissioning cost.
  5. CAO48-2026: Centreville gabion project and additional funding
    Publisher
    Township of South West Oxford
    Published
    2026-09-24
    Event / reporting date
    2026-09-24
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    published
    Passage / page
    PDF pp. 1–4; contract, urgency, funding options
    Evidence notes
    September 15 had not approved additional $40k; September 24 minutes not posted in reviewed official index as of cutoff. Do not call recommendation approved.
  6. TR12-2026: 2025 surplus/deficit and reserve allocation
    Publisher
    Township of South West Oxford
    Published
    2026-08-11
    Event / reporting date
    2026-08-11
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    published
    Passage / page
    PDF pp. 1–15: year-end service and asset actuals; reserve continuity
    Evidence notes
    Management net-budget basis. 2026 reserve column is projected after transfers, not audited 2026 closing cash.
Procurement & awardsPrimary record verified

Published active earlier awards and verified 2026 award decisions

Limit: January–September 2026 source review with earlier active-contract origins. Not a claim every decision, project or invoice is indexed. November draft account numbers remain explicitly superseded.

Next question: Publish the final adopted account export, latest committed spending and complete 2026 award/change register.

Search boundary
  • Final December16 adoption
  • November10 detailed budget agenda
  • 2025 audit and August year-end allocation
  • January–September council agenda/minute index
  • Official award archive
  • September24 special Centreville agenda
5 source records
  1. Official bids and tenders: published award archive
    Publisher
    Township of South West Oxford
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    published
    Passage / page
    Awarded tenders section: grass cutting, Piper Drain, asphalt, Strik Drain
    Evidence notes
    Primary archive opened; later closed tenders are not automatically awards.
  2. WD7-2026: Public Works building roof replacement
    Publisher
    Township of South West Oxford
    Published
    2026-08-11
    Event / reporting date
    2026-08-11
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    published
    Passage / page
    PDF pp. 1–2; three quotes
    Evidence notes
    Recommendation confirmed by Council resolution 13.
  3. WD8-2026: gravel crushing tender results
    Publisher
    Township of South West Oxford
    Published
    2026-08-11
    Event / reporting date
    2026-08-11
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    published
    Passage / page
    PDF pp. 1–2; unit price, budget and policy
    Evidence notes
    Unit-price award. Typical quantity is not invoiced quantity.
  4. WD6-2026: asphalt tender results
    Publisher
    Township of South West Oxford
    Published
    2026-04-07
    Event / reporting date
    2026-04-07
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    published
    Passage / page
    PDF pp. 1–2; bid result and scope
  5. CAO48-2026: Centreville gabion project and additional funding
    Publisher
    Township of South West Oxford
    Published
    2026-09-24
    Event / reporting date
    2026-09-24
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    published
    Passage / page
    PDF pp. 1–4; contract, urgency, funding options
    Evidence notes
    September 15 had not approved additional $40k; September 24 minutes not posted in reviewed official index as of cutoff. Do not call recommendation approved.
Responsibility & decisionsPrimary record verified

Council decisions separated from staff recommendations and UTRCA contracting

Limit: January–September 2026 source review with earlier active-contract origins. Not a claim every decision, project or invoice is indexed. November draft account numbers remain explicitly superseded.

Next question: Publish the final adopted account export, latest committed spending and complete 2026 award/change register.

Search boundary
  • Final December16 adoption
  • November10 detailed budget agenda
  • 2025 audit and August year-end allocation
  • January–September council agenda/minute index
  • Official award archive
  • September24 special Centreville agenda
5 source records
  1. December 16, 2025 Council minutes: By-law 77-2025
    Publisher
    Township of South West Oxford
    Published
    2025-12-16
    Event / reporting date
    2025-12-16
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    adopted
    Passage / page
    Resolution 14; adoption of 2026 estimates
    Evidence notes
    Final adopted schedule controls over November 10 draft.
  2. July 14, 2026 Council minutes
    Publisher
    Township of South West Oxford
    Published
    2026-07-14
    Event / reporting date
    2026-07-14
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    approved minutes
    Passage / page
    Resolutions 4, 15, 17, 19, 22–23
    Evidence notes
    Audit approval; Centreville increase; hub report received; airport request declined; financing by-law.
  3. August 11, 2026 Council minutes
    Publisher
    Township of South West Oxford
    Published
    2026-08-11
    Event / reporting date
    2026-08-11
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    approved minutes
    Passage / page
    Resolutions 13, 14, 17, 18 and 22
    Evidence notes
    Roof/gravel awards, Museum deferral, reserve transfers and accounts-payable approval.
  4. April 7, 2026 Council minutes
    Publisher
    Township of South West Oxford
    Published
    2026-04-07
    Event / reporting date
    2026-04-07
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    approved minutes
    Passage / page
    PDF p. 4, resolution 7: 2026 asphalt award
    Evidence notes
    Approves Permanent Paving bid plus applicable taxes.
  5. CAO48-2026: Centreville gabion project and additional funding
    Publisher
    Township of South West Oxford
    Published
    2026-09-24
    Event / reporting date
    2026-09-24
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    published
    Passage / page
    PDF pp. 1–4; contract, urgency, funding options
    Evidence notes
    September 15 had not approved additional $40k; September 24 minutes not posted in reviewed official index as of cutoff. Do not call recommendation approved.
Payments & contract changesNot found in sources reviewed

Project-specific invoices and executed change orders

Limit: Council AP aggregate approvals are available but do not attribute actual paid amounts to individual projects.

Next question: What has been paid against the hub, roads, grass contract and Centreville, with change orders?

2 source records
  1. July 14, 2026 Council minutes
    Publisher
    Township of South West Oxford
    Published
    2026-07-14
    Event / reporting date
    2026-07-14
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    approved minutes
    Passage / page
    Resolutions 4, 15, 17, 19, 22–23
    Evidence notes
    Audit approval; Centreville increase; hub report received; airport request declined; financing by-law.
  2. August 11, 2026 Council minutes
    Publisher
    Township of South West Oxford
    Published
    2026-08-11
    Event / reporting date
    2026-08-11
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    approved minutes
    Passage / page
    Resolutions 13, 14, 17, 18 and 22
    Evidence notes
    Roof/gravel awards, Museum deferral, reserve transfers and accounts-payable approval.
Candidate & official evidenceNot applicable

Separate countywide candidate evidence workstream

Limit: Collective Council outcomes cannot be assigned as individual votes without a recorded vote.

What the labels mean

Available captions reviewed; audio and written outcome not verified
Awaiting review before factual publication.
Primary record verified
The primary record was opened and the published fields checked. This is not a transaction audit.
Source located; extraction incomplete
A source exists, but this edition has not extracted all relevant detail.
Not found in sources reviewed
The bounded search did not locate the record. Its absence is not proof that the authority does not publish it.
Source temporarily inaccessible
A located source could not be retrieved by the available methods.
Records need reconciliation
Two records differ and have not been fully reconciled.
Not applicable
This record type does not apply to the item.
Extracted; review pending
Awaiting review before factual publication.
Make sense of the money

Make sense of the money

Your taxes called. They’d like a receipt.

Budget
Planned costs for a stated year or project.
Annual allocation
Funding assigned for one year. It may be part of a larger project.
Lifetime project budget
The stated budget for the full project across its years.
Forecast
An estimate of the eventual cost, as of the date shown.
Tax requirement (levy)
The amount to raise from property taxes, after other funding.
Contract award
The accepted contract price, with its stated tax and scope.
Recorded costs or payments
Amounts reported for the period shown. They do not establish project completion.

County spending and County taxes explained →

Open the full money explanation