02Follow the moneyZorra

Zorra · Evidence coverage

Hold this record to account, too.

See exactly which records were reviewed, what has been extracted and what still needs checking.

Money & projects Explore sections

Research method and coverage examples

Baseline financial extraction cutoff: 2026-10-01. Selected records were refreshed October 29; individual sources retain their actual review dates. Coverage is described by authority and record type. A failed retrieval is an access problem, not proof of non-disclosure.

Select a municipality above or expand its research below. Original sources and research limits are retained.

Zorra

History window: January 1, 2026–2026-10-01. Active project origins may precede this window. Selected project-linked decisions are published; this is not a complete register of every resolution.

History sources and coverage boundary
Requested history begins
2026-01-01
Research cutoff
2026-10-01
completeness
No
reviewed Scope
Full adopted 2026 financial/capital schedules; selected first-quarter road and recreation delivery records and awards; May 6 reserve-amendment/building-deficit decisions; May court-tender status; 2025 audited accounts issued July 15. Project status is bounded to its source report and is not presumed current in October.
reviewed Meeting Dates
  • 2026-05-06
record Status By Meeting
Adopted minutes and original storage/building reports reviewed; Q1 roads report bears inconsistent April15 header and April30 signoff, retained in source note.
earlier Baselines
  • 2025-12-03 adopted 2026 budget and capital plan
  • 2024-07-03 staff dust-suppressant recommendation for 2025-2027 term; adoption not verified
  • 2025 audited consolidated accounts
Actuals reporting cutoff
2026-06-30
Coverage limit
Not a complete January-September Council/project decision register. Later in-year financial/project updates, completion certificates, executed changes and payments remain unverified in this dataset.
Scope notes
V7 adds June 30 net departmental figures and selected later delivery updates. Original approvals and reporting periods remain separate.
9 source records
  1. 2026 final operating budget and ten-year capital plan, report 2025-130
    Publisher
    Township of Zorra
    Published
    2025-12-03
    Event / reporting date
    2025-12-03
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    adopted
    Passage / page
    PDF pp. 1–95; account and project pages retained in rows
    Evidence notes
    Final council-approved schedules. 2025 comparatives restated; 2024 not restated. Capital is excluded from the 2026 operating schedule.
  2. Official finance page: 2026 budget and By-law 2025-51
    Publisher
    Township of Zorra
    Published
    2025-12-03
    Event / reporting date
    2025-12-03
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    adopted
    Passage / page
    2026 budget links
    Evidence notes
    Adoption corroborates final report; draft November report has different totals.
  3. Report 2026-033: Roads Division Q1 update
    Publisher
    Township of Zorra
    Published
    2026-05-06
    Event / reporting date
    2026-05-06
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    published
    Passage / page
    PDF pp. 1–3; tender results and project update
    Evidence notes
    Report header says April 15, approval April 30; May 6 Council agenda receives it. Event date uses Council receipt; inconsistent header retained in note.
  4. Recreation and Facilities seasonal update Q1
    Publisher
    Township of Zorra
    Published
    2026-05-06
    Event / reporting date
    2026-05-06
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    published
    Passage / page
    PDF pp. 1–2 capital status and p. 6 facility utilization
    Evidence notes
    Status is as of report, not a fabricated October completion.
  5. May 6, 2026 Council minutes
    Publisher
    Township of Zorra
    Published
    2026-05-06
    Event / reporting date
    2026-05-06
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    approved minutes
    Passage / page
    Resolutions 12-05-2026 and 18-05-2026
    Evidence notes
    Carried motions; no roll-call supplied for these decisions.
  6. Report 2026-046: TDRC storage shed tender results
    Publisher
    Township of Zorra
    Published
    2026-05-06
    Event / reporting date
    2026-05-06
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    published
    Passage / page
    PDF pp. 1–4; full 11-bid table p. 4
    Evidence notes
    Lowest bid and negotiation authority do not establish an executed construction award.
  7. Report 2026-035: 2025 annual Building Department financial report
    Publisher
    Township of Zorra
    Published
    2026-05-06
    Event / reporting date
    2026-05-06
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    published
    Passage / page
    PDF pp. 1–3
    Evidence notes
    Building reserve closing schedule explicitly unaudited; distinguish from July consolidated audit.
  8. Thamesford multi-use court tender portal
    Publisher
    Township of Zorra
    Published
    2026-05-13
    Event / reporting date
    2026-05-13
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    published
    Passage / page
    Bid status and public bid summary
    Evidence notes
    Portal shows awarded status; accessible bid summary shows Van Roestel total, while dynamic award-vendor rows were not exposed. Tax basis not given in accessible summary.
  9. 2025 audited consolidated financial statements
    Publisher
    Township of Zorra
    Published
    2026-07-15
    Event / reporting date
    2026-07-15
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    audited
    Passage / page
    PDF pp. 5–7 and 14–15; notes 8–9
    Evidence notes
    Unmodified audit report; year ended December 31, 2025.

7 budget schedules · 759 extracted allocation rows · 41 projects · 20 procurement records · 7 decisions

Extracted 2026 decision dates: 2026-05-06 · 2026-08-13. These dates are not a list of all meetings reviewed.

Zorra · records researched through 2026-10-01
Record typeResearch stateCoverage & remaining question
Approved operating budgetPrimary record verified

Final approved levy and detailed signed accounts

Limit: The reviewed sources do not establish a full 2026 invoice or change-order register.

Next question: Publish latest commitments, change orders and completion certificates.

Search boundary
  • Final finance package
  • 2025 audited statements
  • May 6 agenda and adopted minutes
  • Q1 roads and recreation reports
  • Public tender portal
2 source records
  1. 2026 final operating budget and ten-year capital plan, report 2025-130
    Publisher
    Township of Zorra
    Published
    2025-12-03
    Event / reporting date
    2025-12-03
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    adopted
    Passage / page
    PDF pp. 1–95; account and project pages retained in rows
    Evidence notes
    Final council-approved schedules. 2025 comparatives restated; 2024 not restated. Capital is excluded from the 2026 operating schedule.
  2. Official finance page: 2026 budget and By-law 2025-51
    Publisher
    Township of Zorra
    Published
    2025-12-03
    Event / reporting date
    2025-12-03
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    adopted
    Passage / page
    2026 budget links
    Evidence notes
    Adoption corroborates final report; draft November report has different totals.
Approved capital budgetPrimary record verified

Complete 38-row 2026 project allocation register

Limit: The reviewed sources do not establish a full 2026 invoice or change-order register.

Next question: Publish latest commitments, change orders and completion certificates.

Search boundary
  • Final finance package
  • 2025 audited statements
  • May 6 agenda and adopted minutes
  • Q1 roads and recreation reports
  • Public tender portal
2 source records
  1. 2026 final operating budget and ten-year capital plan, report 2025-130
    Publisher
    Township of Zorra
    Published
    2025-12-03
    Event / reporting date
    2025-12-03
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    adopted
    Passage / page
    PDF pp. 1–95; account and project pages retained in rows
    Evidence notes
    Final council-approved schedules. 2025 comparatives restated; 2024 not restated. Capital is excluded from the 2026 operating schedule.
  2. Official finance page: 2026 budget and By-law 2025-51
    Publisher
    Township of Zorra
    Published
    2025-12-03
    Event / reporting date
    2025-12-03
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    adopted
    Passage / page
    2026 budget links
    Evidence notes
    Adoption corroborates final report; draft November report has different totals.
Detailed service & account schedulesPrimary record verified

Account-level operating and project-level capital rows

Limit: The reviewed sources do not establish a full 2026 invoice or change-order register.

Next question: Publish latest commitments, change orders and completion certificates.

Search boundary
  • Final finance package
  • 2025 audited statements
  • May 6 agenda and adopted minutes
  • Q1 roads and recreation reports
  • Public tender portal
Open the source record
  1. 2026 final operating budget and ten-year capital plan, report 2025-130
    Publisher
    Township of Zorra
    Published
    2025-12-03
    Event / reporting date
    2025-12-03
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    adopted
    Passage / page
    PDF pp. 1–95; account and project pages retained in rows
    Evidence notes
    Final council-approved schedules. 2025 comparatives restated; 2024 not restated. Capital is excluded from the 2026 operating schedule.
Amendments & carryforwardsPrimary record verified

Storage project $60,000 amendment with 2027 deferral

Limit: The reviewed sources do not establish a full 2026 invoice or change-order register.

Next question: Publish latest commitments, change orders and completion certificates.

Search boundary
  • Final finance package
  • 2025 audited statements
  • May 6 agenda and adopted minutes
  • Q1 roads and recreation reports
  • Public tender portal
2 source records
  1. May 6, 2026 Council minutes
    Publisher
    Township of Zorra
    Published
    2026-05-06
    Event / reporting date
    2026-05-06
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    approved minutes
    Passage / page
    Resolutions 12-05-2026 and 18-05-2026
    Evidence notes
    Carried motions; no roll-call supplied for these decisions.
  2. Report 2026-046: TDRC storage shed tender results
    Publisher
    Township of Zorra
    Published
    2026-05-06
    Event / reporting date
    2026-05-06
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    published
    Passage / page
    PDF pp. 1–4; full 11-bid table p. 4
    Evidence notes
    Lowest bid and negotiation authority do not establish an executed construction award.
Latest interim actualsPrimary record verified

2026 interim operating net requirements through June 30; nine parent departments extracted.

Limit: Not capital project spending; pending invoices and allocations. Annual comparator differs by $88,000 from V6 original adopted levy.

Next question: Which entries explain the $88,000 budget comparator difference and the later capital expenditure position?

Search boundary
  • Final finance package
  • 2025 audited statements
  • May 6 agenda and adopted minutes
  • Q1 roads and recreation reports
  • Public tender portal
Open the source record
  1. Report 2026-081: Financial Results to June 30, 2026
    Publisher
    Township of Zorra
    Published
    2026-08-13
    Event / reporting date
    2026-08-13
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    published
    Passage / page
    pp. 1–2 basis; pp. 3–6 finance table
    Evidence notes
    Interim operating report excludes capital costs as a project-spending measure and has pending allocations/reserve entries. Its taxation budget is $12,917,962 versus original adopted levy $12,829,962 in V6, a difference of $88,000 not yet reconciled by amendment evidence.
Audited annual accountsPrimary record verified

2025 consolidated financial statements

Limit: The reviewed sources do not establish a full 2026 invoice or change-order register.

Next question: Publish latest commitments, change orders and completion certificates.

Search boundary
  • Final finance package
  • 2025 audited statements
  • May 6 agenda and adopted minutes
  • Q1 roads and recreation reports
  • Public tender portal
Open the source record
  1. 2025 audited consolidated financial statements
    Publisher
    Township of Zorra
    Published
    2026-07-15
    Event / reporting date
    2026-07-15
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    audited
    Passage / page
    PDF pp. 5–7 and 14–15; notes 8–9
    Evidence notes
    Unmodified audit report; year ended December 31, 2025.
Funding, reserves & debtPrimary record verified

Capital financing and audited debt/reserves

Limit: The reviewed sources do not establish a full 2026 invoice or change-order register.

Next question: Publish latest commitments, change orders and completion certificates.

Search boundary
  • Final finance package
  • 2025 audited statements
  • May 6 agenda and adopted minutes
  • Q1 roads and recreation reports
  • Public tender portal
2 source records
  1. 2025 audited consolidated financial statements
    Publisher
    Township of Zorra
    Published
    2026-07-15
    Event / reporting date
    2026-07-15
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    audited
    Passage / page
    PDF pp. 5–7 and 14–15; notes 8–9
    Evidence notes
    Unmodified audit report; year ended December 31, 2025.
  2. 2026 final operating budget and ten-year capital plan, report 2025-130
    Publisher
    Township of Zorra
    Published
    2025-12-03
    Event / reporting date
    2025-12-03
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    adopted
    Passage / page
    PDF pp. 1–95; account and project pages retained in rows
    Evidence notes
    Final council-approved schedules. 2025 comparatives restated; 2024 not restated. Capital is excluded from the 2026 operating schedule.
Active projects & timelinesPrimary record verified

Roads/recreation status and project register

Limit: The reviewed sources do not establish a full 2026 invoice or change-order register.

Next question: Publish latest commitments, change orders and completion certificates.

Search boundary
  • Final finance package
  • 2025 audited statements
  • May 6 agenda and adopted minutes
  • Q1 roads and recreation reports
  • Public tender portal
4 source records
  1. 2026 final operating budget and ten-year capital plan, report 2025-130
    Publisher
    Township of Zorra
    Published
    2025-12-03
    Event / reporting date
    2025-12-03
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    adopted
    Passage / page
    PDF pp. 1–95; account and project pages retained in rows
    Evidence notes
    Final council-approved schedules. 2025 comparatives restated; 2024 not restated. Capital is excluded from the 2026 operating schedule.
  2. Report 2026-033: Roads Division Q1 update
    Publisher
    Township of Zorra
    Published
    2026-05-06
    Event / reporting date
    2026-05-06
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    published
    Passage / page
    PDF pp. 1–3; tender results and project update
    Evidence notes
    Report header says April 15, approval April 30; May 6 Council agenda receives it. Event date uses Council receipt; inconsistent header retained in note.
  3. Recreation and Facilities seasonal update Q1
    Publisher
    Township of Zorra
    Published
    2026-05-06
    Event / reporting date
    2026-05-06
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    published
    Passage / page
    PDF pp. 1–2 capital status and p. 6 facility utilization
    Evidence notes
    Status is as of report, not a fabricated October completion.
  4. Report 2026-046: TDRC storage shed tender results
    Publisher
    Township of Zorra
    Published
    2026-05-06
    Event / reporting date
    2026-05-06
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    published
    Passage / page
    PDF pp. 1–4; full 11-bid table p. 4
    Evidence notes
    Lowest bid and negotiation authority do not establish an executed construction award.
Procurement & awardsPrimary record verified

Four explicit 2026 staff-reported awards; full shed bid table; other procurement stages separated

Limit: The reviewed sources do not establish a full 2026 invoice or change-order register.

Next question: Publish latest commitments, change orders and completion certificates.

Search boundary
  • Final finance package
  • 2025 audited statements
  • May 6 agenda and adopted minutes
  • Q1 roads and recreation reports
  • Public tender portal
3 source records
  1. Report 2026-033: Roads Division Q1 update
    Publisher
    Township of Zorra
    Published
    2026-05-06
    Event / reporting date
    2026-05-06
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    published
    Passage / page
    PDF pp. 1–3; tender results and project update
    Evidence notes
    Report header says April 15, approval April 30; May 6 Council agenda receives it. Event date uses Council receipt; inconsistent header retained in note.
  2. Report 2026-046: TDRC storage shed tender results
    Publisher
    Township of Zorra
    Published
    2026-05-06
    Event / reporting date
    2026-05-06
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    published
    Passage / page
    PDF pp. 1–4; full 11-bid table p. 4
    Evidence notes
    Lowest bid and negotiation authority do not establish an executed construction award.
  3. Thamesford multi-use court tender portal
    Publisher
    Township of Zorra
    Published
    2026-05-13
    Event / reporting date
    2026-05-13
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    published
    Passage / page
    Bid status and public bid summary
    Evidence notes
    Portal shows awarded status; accessible bid summary shows Van Roestel total, while dynamic award-vendor rows were not exposed. Tax basis not given in accessible summary.
Responsibility & decisionsPrimary record verified

Carried reserve approvals and delegated award report

Limit: The reviewed sources do not establish a full 2026 invoice or change-order register.

Next question: Publish latest commitments, change orders and completion certificates.

Search boundary
  • Final finance package
  • 2025 audited statements
  • May 6 agenda and adopted minutes
  • Q1 roads and recreation reports
  • Public tender portal
2 source records
  1. May 6, 2026 Council minutes
    Publisher
    Township of Zorra
    Published
    2026-05-06
    Event / reporting date
    2026-05-06
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    approved minutes
    Passage / page
    Resolutions 12-05-2026 and 18-05-2026
    Evidence notes
    Carried motions; no roll-call supplied for these decisions.
  2. Report 2026-033: Roads Division Q1 update
    Publisher
    Township of Zorra
    Published
    2026-05-06
    Event / reporting date
    2026-05-06
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    published
    Passage / page
    PDF pp. 1–3; tender results and project update
    Evidence notes
    Report header says April 15, approval April 30; May 6 Council agenda receives it. Event date uses Council receipt; inconsistent header retained in note.
Payments & contract changesNot found in sources reviewed

Project-specific actual payments and executed changes

Limit: Award amounts and reserve authority are not payments.

Next question: What has been paid against each contract and what changes were executed?

2 source records
  1. Report 2026-033: Roads Division Q1 update
    Publisher
    Township of Zorra
    Published
    2026-05-06
    Event / reporting date
    2026-05-06
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    published
    Passage / page
    PDF pp. 1–3; tender results and project update
    Evidence notes
    Report header says April 15, approval April 30; May 6 Council agenda receives it. Event date uses Council receipt; inconsistent header retained in note.
  2. Report 2026-046: TDRC storage shed tender results
    Publisher
    Township of Zorra
    Published
    2026-05-06
    Event / reporting date
    2026-05-06
    Retrieved
    2026-10-01
    Verified
    2026-10-01
    Evidence status
    verified_primary
    Decision / approval status
    published
    Passage / page
    PDF pp. 1–4; full 11-bid table p. 4
    Evidence notes
    Lowest bid and negotiation authority do not establish an executed construction award.
Candidate & official evidenceNot applicable

Candidate evidence compiled in separate countywide workstream

Limit: Collective decisions do not establish every councillor’s personal position.

What the labels mean

Available captions reviewed; audio and written outcome not verified
Awaiting review before factual publication.
Primary record verified
The primary record was opened and the published fields checked. This is not a transaction audit.
Source located; extraction incomplete
A source exists, but this edition has not extracted all relevant detail.
Not found in sources reviewed
The bounded search did not locate the record. Its absence is not proof that the authority does not publish it.
Source temporarily inaccessible
A located source could not be retrieved by the available methods.
Records need reconciliation
Two records differ and have not been fully reconciled.
Not applicable
This record type does not apply to the item.
Extracted; review pending
Awaiting review before factual publication.
Make sense of the money

Make sense of the money

Your taxes called. They’d like a receipt.

Budget
Planned costs for a stated year or project.
Annual allocation
Funding assigned for one year. It may be part of a larger project.
Lifetime project budget
The stated budget for the full project across its years.
Forecast
An estimate of the eventual cost, as of the date shown.
Tax requirement (levy)
The amount to raise from property taxes, after other funding.
Contract award
The accepted contract price, with its stated tax and scope.
Recorded costs or payments
Amounts reported for the period shown. They do not establish project completion.

County spending and County taxes explained →

Open the full money explanation