2026 capital allocations capital allocation · 2026 · CAD · As reported in source; no HST conversion inferred
Original approved$5,154,993
Revised authorizationNot established
Reported actualNot establishedNo reporting cutoff established
Published forecastNot established
Does the breakdown add up?
Source total $5,154,993Covered on the stated basis $5,154,992Unreconciled / unextracted remainder $1
All 36 detailed 2026 allocations total $5,154,992, matching Schedule C financing and $1 below its published expenditure total. Original discrepancy retained.
Definitions, changes & interpretation
All 36 2026 detailed project/program allocations extracted; 2027–2030 forecasts excluded. Pumper annual increment must not be confused with its unspent 2025 authorization.
CAD · Largest 12 extracted rows by absolute magnitude on this basis. Signed inflows or recoveries retain their minus sign. The full accessible table and sources are below.
These records support the linked project or financial entries. A record link does not establish that every amount or outcome appears in every source. Dated observations and earlier qualifications remain separate.
supporting detailed schedules; final totals controlled by 2026-10
Passage / page
Complete 111-page package; individual PDF pages/account codes in rows
Evidence notes
Opened full 11,959,726-byte original and extracted text. Supporting schedules retain proposed labels; adoption by-law controls the final levy. Draft Schedule A1 uses $8,678,778 tax levy and does not balance to the final requirement; do not publish this draft revenue figure as the adopted levy.
Posted October 21 written minutes record a carried motion accepting Vandenberk Construction Inc.’s bid of $373,454.20 exclusive of taxes, with contingency if needed, and authorizing the CAO and Treasurer to sign. The staff report specifies $50,000 contingency; the motion does not repeat that amount. Formal minutes adoption, an executed agreement and completion have not been verified.
East Zorra-Tavistock
Bid acceptance recorded in written minutes; adoption unverified
2026 allocation
$600,000
Named supplier
Vandenberk Construction
Next target
No next date listed
Latest update
2026-10-21 · Written minutes record bid acceptance