Allocation in detailed capital schedule, PDF p. 81; later-year forecasts are excluded. 2026 construction assumption $350/sq ft for 7,500 sq ft. Separate 2025 site/engineering allocation $225,000, with $24,126 recorded actual in budget package. Construction budget is not a verified award.
Sources & evidence
These records support the linked project or financial entries. A record link does not establish that every amount or outcome appears in every source. Dated observations and earlier qualifications remain separate.
supporting detailed schedules; final totals controlled by 2026-10
Passage / page
Complete 111-page package; individual PDF pages/account codes in rows
Evidence notes
Opened full 11,959,726-byte original and extracted text. Supporting schedules retain proposed labels; adoption by-law controls the final levy. Draft Schedule A1 uses $8,678,778 tax levy and does not balance to the final requirement; do not publish this draft revenue figure as the adopted levy.